The trade

Safety-critical by definition.

Every lift on your site depends on the rigger. We recruit riggers with experience on steel erection, equipment setting, refinery shutdowns and heavy lifts. Levels range from rigger helpers to senior riggers who prepare lift plans with the lifting supervisor.

  • Sling selection, angles and load calculation
  • Shackles, spreader bars and chain blocks
  • Crane hand signals and radio communication
  • Tag lines, exclusion zones and pre-lift checks
The test

A lift, start to finish.

Candidates inspect rigging gear and reject faulty items we include, calculate a sling load for a given weight and angle, rig a load and signal a crane through a controlled lift and set-down. The test is filmed and scored by an experienced lifting supervisor. Third-party rigger certificates (Level I, II or III) are verified with the issuing body where possible.

Where they are needed

Plants, steel and ports.

Riggers are central to oil, gas and petrochemical shutdowns, steel-structure erection, power plant construction and port operations. We supply them individually or as part of a complete mechanical crew.

Paperwork

Both sides covered.

Work permit files for your country, verified experience letters, BEOE protector clearance and, for the Gulf, GAMCA medical — all handled before the rigger travels.

Employer questions

Questions employers ask.

Do your riggers hold third-party certificates?

Many do, especially those with Gulf experience. We verify them and note the level on the score sheet.

Can you supply lifting supervisors?

Yes, in smaller numbers, tested on lift planning as well as practical rigging.

How quickly can riggers mobilise for a shutdown?

Shortlist in 7 working days; Gulf mobilisation typically 4 to 6 weeks after selection. We plan earlier for fixed shutdown windows.

Recruitment fee?

Zero cost to the employer.

Planning heavy lifts?

Send the headcount, certification level and start date.